This documentation (Bonita Open Solution V5) is an archive. Please click here for current documentation.
Advanced search

Create simulation reports

Community

When a process is run, simulation reports are created in PDF format, and saved to a folder.

The report contains the following graphs, by default:

  • Load profile: total number of iterations run
  • Instances Execution Time: execution time in hours vs date
  • Time by Instance: minimum, average, and maximum execution times calculated over all iterations
  • Instances Waiting Time: waiting (inactive) time vs date
  • Waiting Times by Instance: minimum, average, and maximum waiting (inactive) times calculated over all iterations
  • Instances Cumulated Time: execution time + waiting time calculated over all iterations

Then follows a series of reports calculated for each element in the Process:

  • Instances Execution Time
  • Execution Time by Instance
  • Instances Waiting Time
  • Waiting Time by Instance

These are followed by a series of reports for each Resource used in the Process:

  • Time Consumption: number/amount of this resource consumed or used vs date
  • Consumption by Instance: minimum, average, and maximum resource consumption or usage calculated over all iterations
  • Total Resources Consumption: total number of this resource consumed or used
  • Time Cost: total cost of this resource consumed or used vs date
  • Cost by Instance: minimum, average, and maximum resource cost calculated over all iterations
  • Total Resources Cost: total cost of this resource
  • Time Utilization: utilization of this resource vs date
  • Utilization by instance: minimum, average, and maximum resource consumption or usage by percentage, as compared to the total available
  • Total Utilization: total amount of this resource consumed or used, by percentage as compared to the total available
Please login to access documentation. Login
No account yet? Create one. Sign Up